|
Follow the navigation arrows above to either return to the Ecohouse homepage (up) to view the next slide (right), or to return to the previous slide (left)
|
Ecohouse slide A9
Roof and upstairs windows before work. Solar panels will be placed on the roof to supply water for the new boiler (go to Ecohouse slide E3 to see these now they are fitted).
|