|
Follow the navigation arrows above to either return to the Ecohouse homepage (up) to view the next slide (right), or to return to the previous slide (left)
|
Ecohouse slide D12
A collage showing the work on the roof of the extension.
Top left: Battens fixed ready for the cedar shingles
Top right: Cedar shingles being laid on the roof
Bottom left: Cedar shingles
Bottom right: Cedar shingles now complete.
(photos Michael Graves)
|